2015 January-February

The lidar was operated in zenith mode in early nights. Later in the campaign, the beam steering was installed and horizontal wind were measured. Raw data was acquired at 6 sec integration time when in zenith only model. The raw integration time during off-zenith nights is 90 sec.

Click on the date to download the data for each night or download the entire data for this campaign from here.

 

Date Na T W U V High Alt Na
2015.01.16      
2015.01.17      
2015.01.18      
2015.01.19      
2015.01.20      
2015.01.21      
2015.01.22      
2015.01.23      
2015.01.26    
2015.01.27  
2015.01.28  
2015.01.29  
2015.01.30  
2015.01.31      
2015.02.01      
2015.02.02